Sign In | Join Free | My xuijs.com
China HUNAN MEGA DRILLTECH CO., LTD. logo
HUNAN MEGA DRILLTECH CO., LTD.
China Drilling Rig One-stop Servie Safe,Efficient,Cost-Effective Drilling Solutions
Verified Supplier

4 Years

Home > Concrete Compression Machine >

Manual Concrete Compression Machine 2000 Kn Compression Testing Machine

HUNAN MEGA DRILLTECH CO., LTD.
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now

Manual Concrete Compression Machine 2000 Kn Compression Testing Machine

  • 1
  • 2
  • 3

Brand Name : MEGA

Model Number : MDT-2000KN

Place of Origin : CHINA

MOQ : 1 units

Price : 3000USD

Payment Terms : T/T, T/T

Supply Ability : 20 units per week

Delivery Time : 5-8 days

Contact Now

2000KN Concrete Compressive Strength Testing Machine, Manual Concrete Compression Testing Machines

2000KN Concrete Compressive Strength Testing Machine, Manual Concrete Compression Testing Machines

Product Specification

Product name Concrete Cement Compression Test Equipment
Model MDT-2000
Maximum load 2000KN
Minimum resolution 0.1KN

Maximum distance between

pressure plates

320mm
upper and lower pressure plates size 220mm ,250mm
Piston diameter x Max. stroke Φ250mm, 30mm
Motor power 0.75KW
Voltage 240V,,220V,380V
Overall Dimensions 900x 360x 1300mm
Net weight 700Kg

Detailed Features And Design

  • Electric and hydraulic load manually, sensor measure the force.
  • The screen display loading speed, breaking peak value, data storage, printing, inquiry and compression strength conversion
  • Hydraulic Digital Lab Concrete Compressive Test Equipment adopts hydraulic loading, electronic measuring force, with a load of figures, the loading rate shows ,the maximum load to maintain, as well as overload protection and power data retention and other functions.

  • Safety protection device: When the test force more than 3% of the maximum test force, the overload protection, oil pump motor shut down.
  • The oil tank is sucked through the filter screen and be inhaled pump oil ,through the petroleum pipeline of oil pump transport to oil valve,When the hand wheel to send off the oil,due to the role of oil will push the piston,the oil from the return pipe to tank, when the hand wheel to open get the oil, then the working fluid into the fuel tank through the tubing, pressure tubing through and through oil return valve to tank.


Product Tags:

Manual Concrete Compression Machine

      

2000KN Concrete Compression Machine

      

Manual 2000 kn compression testing machine

      
Best Manual Concrete Compression Machine 2000 Kn Compression Testing Machine wholesale

Manual Concrete Compression Machine 2000 Kn Compression Testing Machine Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: HUNAN MEGA DRILLTECH CO., LTD.
*Subject:
*Message:
Characters Remaining: (0/3000)
 
Inquiry Cart 0